日本强伦片中文字幕免费看-久久久精品午夜免费不卡-精品国偷自产在线-日日碰狠狠添天天爽无码-人妻av无码一区二区三区

您好,歡迎訪問濟南凱軒鵬宇玻璃有限公司 網站

全國咨詢熱線:

400-9968-996

當前位置:首頁>新聞資訊>行業動態感應門的安裝方式與過程

感應門的安裝方式與過程

文章出處:http://m.hzsxbj.com/ 人氣: 0 發表時間:2023-04-21
感應門是一種無需人工推拉或開關的門,可以自動識別人或物體的靠近或離開,從而實現自動開啟或關閉。感應門通過安裝在門上的傳感器,根據人或物體接近門的距離和速度,控制門的開啟和關閉。下面來講講濟南感應門的安裝方式和過程,如下:
An induction door is a type of door that does not require manual pushing or opening or closing, and can automatically recognize the approaching or leaving of people or objects, thereby achieving automatic opening or closing. The sensing door controls the opening and closing of the door based on the distance and speed of people or objects approaching the door through sensors installed on the door. Next, let's talk about the installation method and process of Jinan induction doors, as follows:
確定安裝位置:在選擇安裝位置時,需要考慮門的用途和通行人群,以及墻體的承重能力和結構穩定性。
Determine the installation position: when selecting the installation position, it is necessary to consider the use of the door and the crowd, as well as the load-bearing capacity and structural stability of the wall.
安裝門扇和門框:安裝門扇和門框需要根據實際情況選擇門扇和門框的規格型號,然后進行門扇和門框的對齊固定。
Installation of door leaves and frames: To install door leaves and frames, it is necessary to select the specifications and models of the door leaves and frames according to the actual situation, and then align and fix the door leaves and frames.
安裝電控箱和探頭:電控箱和探頭的安裝需要在門框和橫梁處預留適當的孔位,安裝時需要注意電路的接線,以確保電控箱和探頭能夠正常工作。
Installation of electric control box and probe: The installation of electric control box and probe requires appropriate holes to be reserved at the door frame and crossbeam. During installation, attention should be paid to the wiring of the circuit to ensure that the electric control box and probe can work normally.
濟南感應門
系統調試:完成組裝后,需要對系統進行調試。先檢查各個零部件的連接是否正常,然后通過電子設備進行調試,以確保感應門的所有功能正常。
System debugging: After completing the assembly, the system needs to be debugged. Firstly, check whether the connections of various components are normal, and then debug through electronic devices to ensure that all functions of the sensing door are normal.
安裝配套設備:如果需要安裝配套設備(如紅外線和警示燈等),則需要根據實際情況進行選型和安裝。
Installation of supporting equipment: If it is necessary to install supporting equipment (such as infrared and warning lights), the selection and installation should be based on the actual situation.
安裝墊塊和密封條:在具體的安裝過程中,需要在門扇下部安裝墊塊和密封條,以避免門扇的摩擦和產生過多的噪音。
Installation of cushion blocks and sealing strips: During the specific installation process, it is necessary to install cushion blocks and sealing strips at the lower part of the door leaf to avoid friction and excessive noise generated by the door leaf.
調試系統:在安裝完成后,需要對系統進行測試和調整,以確保感應門的所有功能都能夠正常運作,同時也需要注意系統的性和可靠性。
Debugging the system: After installation, it is necessary to test and adjust the system to ensure that all functions of the sensing door can operate normally, while also paying attention to the safety and reliability of the system.
總的來說,感應門的安裝需要考慮到很多因素,需要根據實際情況進行選型和安裝,通過合理的安裝方式和調試,可以確保感應門的正常使用和運作。更多相關事項歡迎來我們網站http://m.hzsxbj.com咨詢了解!
Overall, the installation of sensing doors requires consideration of many factors, and selection and installation should be based on the actual situation. Through reasonable installation methods and debugging, the normal use and operation of sensing doors can be ensured. Welcome to our website for more related matters http://m.hzsxbj.com Consultation and understanding!
?
主站蜘蛛池模板: 国内精品国产成人国产三级| 国产又黄又大又粗的视频| 国语精品一区二区三区| 蜜臀av在线观看| 伊人久久亚洲精品一区| 日本一道综合久久aⅴ久久| 欧美性插b在线视频网站| 无码人妻h动漫中文字幕 | 18禁裸男晨勃露j毛免费观看| 国产亚洲精品久久久久久久久动漫 | 欧美乱色伦图片区| 国产精品aⅴ视频在线播放| 国产三级| 国产一区二区三四区| 女人张开腿让男人桶个爽| 黑森林福利视频导航| 精品一区二区ww| 中文字幕亚洲综合久久菠萝蜜| 国产精品青青在线观看爽香蕉| 久久99精品久久久久久动态图| 色婷婷久久一区二区三区麻豆| 伊人99综合精品视频| 亚洲国产成人无码网站大全| 日韩无套内射视频6| 欧美真人性做爰全过程| 国产美女视频国产视视频| 无人区乱码一区二区三区| 亚洲国产精品自在在线观看| 日本乱偷人妻中文字幕| 无码人妻久久一区二区三区免费丨| 噜噜色综合噜噜色噜噜色| 午夜成人理论无码电影在线播放 | 国产爆乳无码视频在线观看| 久久超碰色中文字幕超清| 夜晚成人18禁区导航网站| 丰满熟妇乱又伦在线无码视频| 在线播放国产精品三级| 亚洲一区综合图区| 风韵丰满熟妇啪啪区老老熟妇| 日日摸天天摸97狠狠婷婷| 3d动漫精品一区二区三区|